Concreting the base for the swimming pool
The next step was to concrete the floor, the mix had to be very dry in order for us to form the rounded bottom of the deep end – this made it very hard to move it around and to smooth it down. In addition we had too much (for the walls we didn’t have enough!) cement – so we ended up shovelling lots out and putting it around the base of the walls outside. Unfortunately you can’t send concrete back and get a refund! Hey, ho!



















The new stairs had to be made to measure, and my main aim was to have them arrive in the middle of the room upstairs, so that the sloping ceilings were not and issue.

The stairs are very straight and upright and open treads. People are often worried about going up and down them. This coupled with the top of the stairs arriving under the sloping ceiling (you have to duck considerably) led me to take the decision to carry out a major renovation of Pomme this winter.
Before Christmas, I replaced two of the bathrooms in Cerise. Originally, the bathrooms had showers recuperated from two other bathrooms downstairs in Poire, but the shower trays had to be installed raised from the floor in order for the waste pipes to pass. This together with corner opening doors, made it awkward to get in and out.



The owl was very sleepy (this being day time for humans and so night time for owls, I presume) and did not want to fly away.